
Quality Inspection
Quality inspection before shipment
Plan a pre-shipment inspection, understand its limits and make a documented release or hold decision for finished goods.
A pre-shipment inspection helps a buyer check finished goods against the agreed order before dispatch. Give the inspector the approved specification, a defined lot, the checks and the acceptance rules.
Review the findings before recording a release or hold decision. An inspection reduces uncertainty; it cannot guarantee every unit or establish product safety compliance on its own.
Set the inspection against the agreed order
Provide the purchase order, approved product and packaging specifications, variant quantities, reference sample and authorised changes. Identify which version controls the inspection. If the factory and the buyer use different versions, measurements may be accurate but irrelevant.
Confirm what is ready and accessible, and identify any limits on what can be inspected.
Schedule the inspection when goods are ready
Coordinate the visit for when production is substantially complete and the finished goods are ready for a final check. This gives the inspector access to the goods intended for shipment, rather than relying on an earlier production snapshot.
If some cartons or variants are unavailable, record that limit; results from available goods cannot stand for goods still in production. If readiness changes, update the inspection plan and make clear what was available at the visit.
Give the inspector usable checks
For each important requirement, state what to observe or measure, the method and what counts as a defect. Checks may cover quantity, dimensions, workmanship, basic function, colour, labelling, carton contents and packing condition, depending on the product and the service commissioned. Prioritise failures that affect use, safety, customer promises or stock identification.
A sample can inform a decision about the lot, but passing results do not prove that every uninspected unit is sound. Ask the inspector to distinguish observations from the overall recommendation.
Check Australian product safety requirements separately from the inspection. A visual inspection or an old sample test report may leave important questions unanswered.
Make quantity checks traceable
Physical counts can connect the inspection lot to the purchase order and packing information. Record carton, pallet or container counts against the packing list, and use a sample of cartons to check whether the unit counts match their labels. Where weights or outer-carton dimensions are checked, compare the results with the packing-list data and record any discrepancy.
Agree the inspection process
Before the visit, confirm the lot definition, inspection scope, sampling plan and pass-or-fail criteria with the supplier and inspector. The Australian Competition and Consumer Commission (ACCC) recommends that pre-shipment inspections have adequate supervision by qualified staff appointed by an independent inspector. Keep the agreed scope and criteria with the order records so reviewers can interpret the result.
Pre-shipment inspection readiness checklist
- Confirmed purchase order and specificationsYes
- Reference sample available and approvedYes
- Agreed sampling plan (e.g., ISO 2859-1) definedYes
- Pass/fail criteria agreed with supplierYes
- Loading supervision plannedYes
Use inspection alongside supplier controls
A finished-goods check is one part of managing product quality, not a substitute for controls during sourcing and production. The ACCC advises checking that a factory is audited regularly, raw materials are tested, assembly processes and quality checks are followed, and staff training is current and adequate. These checks can help identify gaps that a final inspection alone may not reveal.
Review the report and decide
The report should identify the order, inspected lot, available variants, checks performed, sample and defect counts, measurements, photographs and anything that could not be verified. Resolve unclear findings while the goods remain accessible. If a problem is found, keep the affected goods on hold while the supplier proposes a correction and a way to verify it.
Record the report, open issues, relevant test evidence, decision owner, date and quantities released or held. State any accepted exception precisely.
For goods sold to Australian consumers, sellers must honour applicable automatic consumer guarantees, including acceptable quality. Keep the inspection record for delivery and complaint review, with its stated scope and limits.
Key facts on pre-shipment inspections in Australia
- ACCC recommendation
- Inspections should be supervised by qualified, independent staff
- Sampling standard
- ISO 2859-1: AQL-based sampling for quality assessment
- Australian consumer guarantee
- Goods must be of acceptable quality, fit for purpose, and match description
Keep compliance evidence distinct
Where product safety testing or other compliance evidence is relevant, keep it distinct from the visual inspection result.
If a mandatory standard applies, the ACCC says a business may need to ensure the product has been tested; testing may also help establish whether it falls within a ban. The ACCC says businesses can use reliable, independent and preferably accredited laboratories; suitable in-house expertise and facilities; a certification agency; or written third-party test or certification evidence from a supplier.
A pre-production sample test may not provide sufficient assurance without further quality assurance.
Check that the shipment matches the release
A release decision applies to the goods inspected, so retain a clear link between the passed lot and the goods packed for dispatch. Intertek describes loading supervision as a way to confirm that products which passed inspection are the same products packed and shipped. If the goods or lot change after inspection, review whether the original decision still covers them before recording release.
Make the decision operational
Communicate the recorded decision to the supplier and anyone coordinating dispatch before goods are dispatched. Sino Partners describes its inspection process as including formal sign-off authority to hold shipment when goods do not pass.
In this guide
- Choosing inspection checks from the product's risksMap product failures to pre-shipment checks, methods and evidence, while recognising when separate testing is needed.
- Comparing supplier self-checks with independent inspectionCompare supplier quality records with independent inspection by timing, evidence, impartiality and scope.
- Documenting defects with useful photographsCapture context, close-up and scale images, then link each product defect to a clear inspection finding.
- Deciding how to handle a failed pre-shipment inspectionConfirm the failure, choose a remedy, verify corrected goods and record the shipment decision.


